Skip to main content

Search form

centranet-web.pngfoundation-web.png

Home
SmartHub Button
Pay now without logging in.
Menu
  • Your Service
    • Sign Up for Service
    • Payment Options
    • SmartHub
    • Understanding Your Bill
    • Frequently Asked Questions
  • Energy Solutions
    • Backup Generators
    • Residential Energy Audit
    • Electric Vehicles
    • Solar
    • Rebates
  • Outage Center
    • Report an Outage
    • Outage Map
    • How Central Restores Power
    • Preparing for an Outage
    • Using a Backup Generator
  • Community
    • Co-op Connections
    • Operation Round Up
    • Co-op Kids
    • Youth Programs
    • Safety First
  • Cooperative
    • Our Mission, Vision and Values
    • Management Team
    • Board of Trustees
      • Board District Map
      • Board Governance
      • District 1
      • District 2
      • District 3
      • District 4
      • District 5
      • District 6
      • District 7
    • History of Central
  • Resources
    • Membership Forms
    • Annual Report
    • Bylaws
    • Terms and Conditions
    • Rates
    • Vegetation Management
    • Working crew location map
    • Construction Timelines
    • Empowered Newsletter
    • Used Poles
    • Oversize Load Assistance
  • Careers

Upgrade Underway

Monday | January 4, 2021
All News

Central Rural Electric Cooperative’s electrical distribution system is at the beginning of a major system remodel as crews work to prepare it for fiber installation.

A full fiber network will not only assist with reliability and safety, but also it will allow Central to prepare for the future by building the foundation needed to establish data-driven rate designs. It will allow Central to better serve you, our members.

Construction has begun in the Stroud, Perkins and Stillwater areas. Crews are surveying existing overhead infrastructure and making the needed improvements to support new fiber lines.

We have also installed the first of 18 fiber huts. Fiber huts are equivalent to substations on an electrical grid and are the main switchboards for a fiber network. Equipment inside the huts transmit and receive signals from the electrical distribution equipment or home devices to the Central headquarters or internet.

Learn more about the project at mycentral.coop/fiber.

fiber-hut-web.jpg
Above, a crane lifts a fiber hut into place at the Ramsey substation near Perkins. Below, a timeline shows the steps during the construction process. The entire fiber project is expected to take 5-7 years to complete.

 

construction-timeline3.png

Back to Top

About

Central Rural Electric Cooperative is an electric distribution cooperative that serves more than 20,000 meters in seven central Oklahoma counties.

  • Central Careers
  • Central Newsroom

This institution is an equal opportunity provider and employer. This employer participates in E-Verify

 

Resources

Our governing documents direct our business, legal and day-to-day operations.

  • Central Bylaws
  • Central Rates
  • Central Terms and Conditions
  • Central Annual Report
  • Resources

 

Contact

Call or e-mail us.

local: 405-372-2884 toll-free: 800-375-2884

member accounts email

physical: 3305 S. Boomer Rd., Stillwater, OK 74074

mailing: P.O. Box 1809, Stillwater, OK 74076

Follow Central

  • Facebook
  • Instagram

©2025 Central Rural Electric Cooperative. Empowering Our Members and Communities

  • Your Service
    • Sign Up for Service
    • Payment Options
    • SmartHub
    • Understanding Your Bill
    • Frequently Asked Questions
  • Energy Solutions
    • Backup Generators
    • Residential Energy Audit
    • Electric Vehicles
    • Solar
    • Rebates
  • Outage Center
    • Report an Outage
    • Outage Map
    • How Central Restores Power
    • Preparing for an Outage
    • Using a Backup Generator
  • Community
    • Co-op Connections
    • Operation Round Up
    • Co-op Kids
    • Youth Programs
    • Safety First
  • Cooperative
    • Our Mission, Vision and Values
    • Management Team
    • Board of Trustees
      • Board District Map
      • Board Governance
      • District 1
      • District 2
      • District 3
      • District 4
      • District 5
      • District 6
      • District 7
    • History of Central
  • Resources
    • Membership Forms
    • Annual Report
    • Bylaws
    • Terms and Conditions
    • Rates
    • Vegetation Management
    • Working crew location map
    • Construction Timelines
    • Empowered Newsletter
    • Used Poles
    • Oversize Load Assistance
  • Careers